Very professional and excellent quality of work. The guys went above and beyond.
Kieren De Meyer · Site Supervisor · FCC Environment
We deliver technically led civil engineering packages with exacting standards of safety, quality and project control.
From early survey and design coordination through construction and handover, we take full responsibility under one accountable contract. Our directly managed team and specialist supply chain deliver compliant, reliable work without shortcuts.
Explore our capabilities →
Our clients
Trusted across industry
We are a capable civil engineering contractor for industrial, manufacturing, environmental and infrastructure projects—from individual work packages to complete turnkey delivery.
In-house surveying, rigorous planning, experienced management and a proven specialist supply chain give clients one professional team from concept to handover.
Meet Raspin Construction →Core capabilities
Professional, pragmatic delivery—built correctly, controlled thoroughly and documented properly.
Safe, clean construction planned around production, access and restricted working windows.
RC foundations, slabs, pits, drainage, earthworks and external works.
Topographical surveys, setting out, as-builts, machine control and quality checks.
Selected experience
Measured outcomes from operational sites across manufacturing and environmental infrastructure.
Raspin Construction delivered the reinforced concrete foundations required for a new packaging production line. The works involved extensive slab removal, excavation and the construction…
A £109,565 industrial-civils package comprising process foundations, raised containment walls and reinforced equipment plinths at Irideum’s Liverpool facility.
Raspin Construction managed the breakout and replacement of failed transfer-car rails within the curing hall, taking responsibility from design and setting out through to…
Raspin Construction delivered the civil engineering required for a new sprinkler tank installation, coordinating multiple specialist interfaces through a changing project scope.
FCC Environment required durable, clearly separated storage bays for metals handled at its Whisby recycling facility. Raspin Construction constructed a four-bay bunker system using…
Raspin Construction delivered a fast-moving regional programme of infrastructure improvements across thirteen household waste recycling centres while the facilities remained operational.
Raspin Construction delivered Phase 3 of the management works at Danes Moss Landfill SSSI. The purpose was to raise approximately 235m of the existing…
The works comprised multiple machine foundations, a new down-stacker pit, drainage troughs and sumps, together with the filling and reinforced reinstatement of redundant process…
Client feedback
Very professional and excellent quality of work. The guys went above and beyond.
Kieren De Meyer · Site Supervisor · FCC Environment
The service they provide is excellent, so I thought it was worth sharing.
Andy Tyerman · Site Operations Manager · Marshalls
Very impressed. The team who attended are very good and we would have them back anytime.
Anthony Raybone · Engineering Planner · DS Smith
They were very impressed with your level of engagement and knowledge. Well done and thanks for that.
Dan Molua · DS Smith
Completed to an extremely high standard and in front of schedule. Great communication, excellent site cleanliness and a pleasure to work with. Five stars.
Darren McKay · VLT Logistics
The works were completed to a high standard. The team was a pleasure to work with and maintained a safety-first approach throughout.
Pete Brown · HWRC Assistant Manager · FCC Environment
Turnkey delivery
As Principal Contractor, Raspin Construction manages every element—surveying, design coordination, subcontract management, site supervision and client handover.
See how we deliver →Where we work
Our core service area extends to an indicative 2.5-hour drive from Scunthorpe, covering much of Northern and Central England. We also consider projects further afield where the programme and package are the right fit.
The boundary follows our normal road-travel reach rather than a simple radius. Actual journey times vary by route, traffic and site access.
Interactive service-area map centred on Scunthorpe
Start a conversation
Bring us in early for practical, expert input. We can develop and deliver a fully managed package from survey and design coordination through to compliant handover.
Discuss your project →